Good News...
Glad to share with you the professional performance of FM member INTEGRAL CHILE S.A., Chile.
Despite Covid-19, Integral Chile continues to function, fully operate, and work with more strength and optimism every day, providing all their experience and professionalism to their clients and agents.
During these hard times, they successfully handled a shipment for the construction of the Chacao Bridge in Chile, which, in the near future, would connect the large island of Chiloé with the mainland and, furthermore, will be the longest bridge in Latin America, with a length of almost 3 kilometres.
They transported the heavy loads from the south of Chile to the port of Valparaiso, which required a police escort and then be sent to their country of origin, job that was successfully carried out.

About Shipment:
Port of Discharge: Valparaiso / CHILE
Commodity: Heavy machinery and elements
Congratulations to INTEGRAL CHILE S.A. for their excellent job!
VISIT WEBSITE (CLICK HERE!) | VISIT FM PROFILE (CLICK HERE!)